{"id":2677,"date":"1998-01-01T11:22:00","date_gmt":"1998-01-01T09:22:00","guid":{"rendered":"https:\/\/p688098.mittwaldserver.info\/project\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\/"},"modified":"2025-03-29T10:01:55","modified_gmt":"2025-03-29T08:01:55","slug":"monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost","status":"publish","type":"project","link":"https:\/\/www.aee-intec.at\/en\/project\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\/","title":{"rendered":"Monitoring of a transparent insulation system (TI) at a demonstration project in Graz Maria Trost"},"content":{"rendered":"\n<p>Highly efficient and economical advantageous transparent insulation structures, which were composed by different foil materials, were examined and developed in this project at Joanneum Research, Institut f\u00fcr Kunststofftechnik. A pilot system was built for the manufacturing. <\/p>\n\n\n\n<p>A structure on the base of cellulose triacetate was mounted on a demonstration object in Graz Maria Trost (single-family low-energy house). <\/p>\n\n\n\n<p>Monitoring on heat gain and examination of moisture and summer overheating behaviour were carried out on an adapted monitoring field in the transparent insulation fa\u00e7ade on the inhabited object.<\/p>\n\n\n\n<p>The monitoring was carried out during a heat period, during which the TI system was not yet installed and also during two heating periods (with one extreme hot summer period in-between in 2003) where the TI system was mounted.  <\/p>\n\n\n\n<p>The gain from the TI system during the heating period was excellent in comparison to other TI systems of high quality. The monthly determined effective U-values were with one exception in December 2002, all negative (on the side of&nbsp;<a href=\"http:\/\/www.ntsearch.com\/search.php?q=energy&amp;v=55\">energy<\/a>&nbsp;gain). The gain from the TI system (the difference to the losses of the opaque wall of the same object) was 137 kWh\/m\u00b2 during the heating season September 2002 \u2013 April 2003 and 133 kWh\/m\u00b2 during the heating season 2003-2004. The moisture behaviour in the TI structure and in the wall&nbsp;<a href=\"http:\/\/www.ntsearch.com\/search.php?q=construction&amp;v=55\">construction<\/a>&nbsp;behind were shown to be unproblematic. There were no condensate formation thanks to aimed ventilation openings. The&nbsp;<a href=\"http:\/\/www.ntsearch.com\/search.php?q=water&amp;v=55\">water<\/a>&nbsp;vapour pressure in the structure was in general linked to the surrounding air.<\/p>\n\n\n\n<p>The object has a large roof with a large over-hang, which adequately prevents summer overheating on the second floor. There were, on the other hand, on the ground floor, in August &#8211; lower solar altitude and high outdoor temperatures &#8211; high indoor temperatures, which were however accepted from the inhabitants. <\/p>\n","protected":false},"author":4,"featured_media":2672,"parent":0,"menu_order":0,"template":"","class_list":["post-2677","project","type-project","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Monitoring of a transparent insulation system (TI) at a demonstration project in Graz Maria Trost - AEE INTEC<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.aee-intec.at\/en\/project\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\/\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/project\\\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\\\/\",\"url\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/project\\\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\\\/\",\"name\":\"Monitoring of a transparent insulation system (TI) at a demonstration project in Graz Maria Trost - AEE INTEC\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/project\\\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/project\\\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.aee-intec.at\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/bilder169.jpg\",\"datePublished\":\"1998-01-01T09:22:00+00:00\",\"dateModified\":\"2025-03-29T08:01:55+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/project\\\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/project\\\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/project\\\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.aee-intec.at\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/bilder169.jpg\",\"contentUrl\":\"https:\\\/\\\/www.aee-intec.at\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/bilder169.jpg\",\"width\":347,\"height\":234},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/project\\\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/home-page\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project\",\"item\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/project\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Monitoring of a transparent insulation system (TI) at a demonstration project in Graz Maria Trost\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/\",\"name\":\"AEE - Institut f\u00fcr Nachhaltige Technologien\",\"description\":\"Willkommen bei AEE - Institut f\u00fcr Nachhaltige Technologien - AEE INTEC\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/#organization\",\"name\":\"AEE - Institut f\u00fcr Nachhaltige Technologien\",\"url\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.aee-intec.at\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/logo-1.gif\",\"contentUrl\":\"https:\\\/\\\/www.aee-intec.at\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/logo-1.gif\",\"width\":74,\"height\":96,\"caption\":\"AEE - Institut f\u00fcr Nachhaltige Technologien\"},\"image\":{\"@id\":\"https:\\\/\\\/www.aee-intec.at\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/at.linkedin.com\\\/company\\\/aee-intec\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UC7y2Y-8u6IXEJXbVlEy_vew\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Monitoring of a transparent insulation system (TI) at a demonstration project in Graz Maria Trost - AEE INTEC","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.aee-intec.at\/en\/project\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\/","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.aee-intec.at\/en\/project\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\/","url":"https:\/\/www.aee-intec.at\/en\/project\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\/","name":"Monitoring of a transparent insulation system (TI) at a demonstration project in Graz Maria Trost - AEE INTEC","isPartOf":{"@id":"https:\/\/www.aee-intec.at\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.aee-intec.at\/en\/project\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\/#primaryimage"},"image":{"@id":"https:\/\/www.aee-intec.at\/en\/project\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\/#primaryimage"},"thumbnailUrl":"https:\/\/www.aee-intec.at\/wp-content\/uploads\/2025\/03\/bilder169.jpg","datePublished":"1998-01-01T09:22:00+00:00","dateModified":"2025-03-29T08:01:55+00:00","breadcrumb":{"@id":"https:\/\/www.aee-intec.at\/en\/project\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.aee-intec.at\/en\/project\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.aee-intec.at\/en\/project\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\/#primaryimage","url":"https:\/\/www.aee-intec.at\/wp-content\/uploads\/2025\/03\/bilder169.jpg","contentUrl":"https:\/\/www.aee-intec.at\/wp-content\/uploads\/2025\/03\/bilder169.jpg","width":347,"height":234},{"@type":"BreadcrumbList","@id":"https:\/\/www.aee-intec.at\/en\/project\/monitoring-of-a-transparent-insulation-system-ti-at-a-demonstration-project-in-graz-maria-trost\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.aee-intec.at\/en\/home-page\/"},{"@type":"ListItem","position":2,"name":"Project","item":"https:\/\/www.aee-intec.at\/en\/project\/"},{"@type":"ListItem","position":3,"name":"Monitoring of a transparent insulation system (TI) at a demonstration project in Graz Maria Trost"}]},{"@type":"WebSite","@id":"https:\/\/www.aee-intec.at\/en\/#website","url":"https:\/\/www.aee-intec.at\/en\/","name":"AEE - Institut f\u00fcr Nachhaltige Technologien","description":"Willkommen bei AEE - Institut f\u00fcr Nachhaltige Technologien - AEE INTEC","publisher":{"@id":"https:\/\/www.aee-intec.at\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.aee-intec.at\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.aee-intec.at\/en\/#organization","name":"AEE - Institut f\u00fcr Nachhaltige Technologien","url":"https:\/\/www.aee-intec.at\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.aee-intec.at\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.aee-intec.at\/wp-content\/uploads\/2025\/02\/logo-1.gif","contentUrl":"https:\/\/www.aee-intec.at\/wp-content\/uploads\/2025\/02\/logo-1.gif","width":74,"height":96,"caption":"AEE - Institut f\u00fcr Nachhaltige Technologien"},"image":{"@id":"https:\/\/www.aee-intec.at\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/at.linkedin.com\/company\/aee-intec","https:\/\/www.youtube.com\/channel\/UC7y2Y-8u6IXEJXbVlEy_vew"]}]}},"_links":{"self":[{"href":"https:\/\/www.aee-intec.at\/en\/wp-json\/wp\/v2\/project\/2677","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aee-intec.at\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.aee-intec.at\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.aee-intec.at\/en\/wp-json\/wp\/v2\/users\/4"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.aee-intec.at\/en\/wp-json\/wp\/v2\/media\/2672"}],"wp:attachment":[{"href":"https:\/\/www.aee-intec.at\/en\/wp-json\/wp\/v2\/media?parent=2677"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}