ökosan – modernisation-initiative East Styria

Despite a various number of arguments for retrofitting our building there are still only few realized projects, which show the advantages of high-quality retrofitting.

Therefore the project ökosan–modernisation-initiative East Styria was started in 2005 coordinated by AEE INTEC.

Objective:

The main objective focused on initiating showcases to encourage more responsible persons to carry out high-performance retrofitting.

Means:

Within this initiative, widespread service packages for builders and decision makers had been offered. The scope of the service packages ranged from a review of the existing building stock and the elaboration of detailed retrofitting studies to the monitoring and evaluation of the implemented retrofitting measures.

Awareness rising:

Simultaneously the project ökosan.net initiated wide-spread public relations measures, know-transfer-events and information activities. The international conference ökosan´09 is originated from the start-up event ökosan´05. Now this symposium is hosted by the AEE INTEC biannually and attracts more than 400 experts from all over the world.

Results:

The support of decision makers and responsible persons brought out results like:

  • 40 large-volumed buildings within the region of East Styria were investigated (approx. 90.000 m2 gross floor area)
  • 18 high-performance retrofitting projects (already realised or still under construction) with 45.000 m2 retrofitted gross floor area show :

    – An average minus of 70% of energy use for heating and minus 75% CO2-emissions
    – A reduction of 410.000 kg of CO2 – emissions annually
    – An increased quality of the indoor living quality
    – A turnover from fossile fuels to renewable energy sources

Additionally it was possible to set impulses for:

  • The awareness for high-quality and sustainable retrofitting
  • To increase the reputation of the region East Styria as a thematic leader in sustainable retrofitting

Summary:

The final event and presentation of the results was arranged on 18th of Nov. 2009 in Graz. Under the title “Retrofitting offensive: economic viability and quality – a conflict?” the event focused on discussing the final results and showing further conclusions for future´s effort.

Now – after the end of the official life-span of the project – the shining examples should motivate further decision makers. Therefore the AEE INTEC designed a brochure with 16 ökosan-retrofitting-projects. It is essential to convince the persons responsible for the property management of the advantages – not only in gaining long-term affordable running-costs but also in increasing property market values and reaching enhanced indoor living quality.

Customer

Land Steiermark, Abt. 3 – Wissenschaft und Forschung
Bundesministerium für Wirtschaft, Familie und Jugend, Sektion III Wohnbauforschung

Weitere AuftraggeberInnen
Land Steiermark, A 15 – Wohnbauförderung
Land Steiermark, FA 19D Abfall- und Stoffflusswirtschaft
WinBAU – Wirtschaftsinitiative Nachhaltigkeit
NOEST – Netzwerk Öko-Energie Steiermark
Bundesministerium für Land- und Forstwirtschaft, Umwelt und Wasserwirtschaft im Rahmen der Klimaschutzinitiative klima:aktiv

SponsorInnen
Wirtschaftskammer Steiermark – Landesinnung Bau
Bank Austria Creditanstalt

AluKönigStahl GmbH
gap-solar GmbH
STO Ges.m.b.H.
Steirische Gas-Wärme Ges.m.b.H.

Status

completed